Chris White’s Union Pacific – Yellowstone North
- This layout is freelance, based on the assumption that Union Pacific constructed a spur starting at Green River and terminating just south of Yellowstone National Park, through the western mountain ranges of Wyoming. The main purpose of the branch line is to transport passengers from all over the country to Yellowstone prior to the completion of interstates and travel by car. In addition, there are a number of small towns serviced by various local freight trains to a variety of different industries. The layout includes a large passenger terminal and yard at Yellowstone. The layout was specifically designed for operation with two decks and a large helix, and with wider aisles and plenty of opportunities for operations. The track work is 100% complete and the scenery is now 75-80% complete. Approximately 80% of the structures are now on the layout. The backdrop is now finished and are multiple photographs taken on site in Wyoming and made into stunning backdrops by a local sign company.
- City: Roswell
- Scale/Gauge: HO
- Christopher White