The original train layout, 4x8, was constructed as a fold up layout in 1978. The layout would grow to 8x12 in the 90's before expanding to fit a standard bedroom with the layout hugging the walls. After deconstructing the layout in 2001 to move to Georgia, only the 8x12 section would survive the move and 20+ years of storage. During the summer of 2023 the layout would again be placed horizontal and become the cornerstone of the new layout. Benchwork was completed on the newly expanded layout in September of 2023 and since then, over 300 feet of track has been laid. We have followed and visited the majority of layouts that have been on the Piedmont Pilgrimage over the past 10 years and are excited to finally welcome you to ours.
Scale / Gauge
HO
Size of Layout
17x24
Prototype
Freelance
Location Modeled
Freelance
Era
Various
Style of Track Plan
Other
Length of Main Line
100'
Layout Height
lower 45 / middle 50 / upper 54"
Benchwork
Open Grid
Roadbed Material
Cork
Track Manufacturer
Atlas
Turnouts
Atlas
Minimum Main Line Radius
26"
Maximum Grade
2.25 %
% Scenery Complete
5 %
Backdrop
drywall
Control System
DCC - Digitrax
Car Forwarding System
None
Direction Comment
Walk around the house to the right side and follow the steps down to the lower patio area and enter through the basement door.