Mark and Frank Ladd's Senoia Helix Mountain Railroad (O)
Layout Tour Dates
The SMHR was started on January 15, 2012 with great anticipation which continues to this day. We do look forward to sharing some of our experiences with all that would come during the Pilgrimage, or before and after.
Scale |
3 rail O |
Size |
14’ x 21’ |
Prototype |
Freelance |
Locale |
Pine Mountain, GA and vicinity |
Era |
Post War and Modern Era |
Style |
Two dog bones & 2 45” helixes |
Len. of Mainline |
290’ |
Layout Height |
39” to 67” |
Benchwork |
Flat table |
Roadbed |
foam |
Trackwork |
Gargraves 3 rail |
Turnouts |
Gargraves 0-72 and 0-42 |
Min. Radius |
42” |
Maximum Grade |
3.2 % |
Scenery |
Not started |
Backdrop |
Painted walls |
Controls |
MTH DCS |
Wheelchair Accessible |
No |
Directions
From intersection of Ga Hwy 85 in Senoia, GA., go east on hwy 16 toward Griffin 1.4 miles turn right on Dead Oak Rd. go 1.6 miles, turn left on Rowe Rd. go .2 of a mile, turn left on Grey Girls Rd. go .4 miles turn left on Carl Williams Rd go .3 miles to house on right and yellow sign.